# Client Name Brief scope of work as follows Location Project Status
1 Saudi Aramco Project Title :

Replace, fabricate and modification of the recycle pipes at North HSP including welding and hypo testing.
Qurayyah Sea Water Plant (QSWP) complete
2 Saudi Aramco Project Title :

Supply and install 2 Nos. reducer for ZV-783 materials at UGP.
Udhaliayah, Dammam complete
3 Saudi Aramco Project Title :

Replace the recycle piping for 3 modules 2, 5 & 12 including installation of additional two (2 Nos.) flanges on CBP downstream spool.
Udhaliayah, Dammam complete
4 SABIC - DEPCO Project Title :

Design, engineering and construction of civil foundation for the installation of NG filter skid including modification of DCS system, instrumentation with HC detector/differential pressure gauges and 8” piping modification works with complete testing.
Madinat, Al Jubail complete
5 MARAFIQ Project Title :

Supply, installation and maintenance of automatic roll up doors for MARAFIQ (Yanbu) including complete instrumentation and control work at site.
Heavy Industrial Area, Yanbu complete
6 SABIC - SAFCO Project Title :

Design, engineering, installation, testing and commissioning of butterfly 24" valves with modifications in the Cooling Water Pipeline at SABIC - SAFCO.
Jubail, KSA complete
7 SABIC - HADEED Project Title :

Design, engineering, manufacturing, installation, testing and commissioning of oven entry dampers of size 2m x 1.5m (Pneumatically Controlled) for SABIC - HADEED's Color Coating Facility.
Jubail complete
8 Saudi Aramco Project Title :

Dismantling and shipment of knock out drum D-12.
Abqaiq complete
9 SAMSUNG Engr. SA Ltd. Co. Project Title :

Procurement, supply, installation, testing and commissioning of HVAC (duct, air balancing, dampers and equipment installation) including installation of commercial heaters, sanitary fixtures etc at MA'ADEN, Ras Al Khair.
Ras Al Khair complete
10 SABIC - SAFCO Project Title :

Design, engineering, manufacturing, installation, testing and commissioning of expansion joints of size 2m x 1m for the blower fans.
Jubail complete
11 SABIC - SAFCO Project Title :

Design, engineering, manufacturing, Installation, testing and commissioning of sea water strainer at SAFCO.
Jubail complete
12 MARAFIQ Project Title :

Rehabilitation of existing panels and Enclosures for MARAFIQ (Yanbu) including fabrication of damage enclosures, painting, replacement of various components, testing and commissioning.
Heavy Industrial Area, Yanbu complete
13 SABIC - HADEED Project Title :

Design, engineering, fabrication, installation, testing and commissioning of pipeline to re-route condensate line at SABIC - HADEED facilities.
Jubail complete
14 SWCC Project Title :

Design, engineering, supply, installation, testing and commissioning of sub-synchronous converter cascade systems including civil foundation, laying cables/terminations for twelve (12 Nos.) 850kw, 6.6kv slip ring induction motors of pumps.
Aziziah complete
15 Saudi Aramco Project Title :

Design, engineering and execution of installation for the upgradation of CPI system including civil foundation, piping structure, CS piping, RTR piping, lightning for structure, cabling etc.
Haradh Gas Plant complete
16 Saudi Aramco Project Title :

Install sodium hypochlorite system and refurbish existing Chlorination Building North Booster Station No. 4 at5 Abqaiq.
Abqaiq complete
17 SWCC Project Title :

Design, engineering, supply, installation, testing and commissioning of twelve (12 Nos.) units of techno-generators of 850Kw motors in Aziziah Pumping Station.
Aziziah complete
18 Saudi Aramco Project Title :

Remove/reinstall trays stabilizer for T&I at Khurais GOSP -2 works.
Khurais complete
19 Saudi Aramco Project Title :

Fabricate 1 EA 16 " flare tip for HWGOSP – 2 Burn Pit.
Hawiyah complete
20 Saudi Aramco Project Title :

Remove/reinstall Coalescer Packing on D–201 vessels at Khurais GOSP – 1 T&I .
Khurais complete
21 Saudi Aramco Project Title :

Supply, fabrication and upgradation of flare and relief system at ABGOSP-2 including site installation, modification at existing piping with hydro testing.
Abqaiq complete
22 Saudi Aramco Project Title :

Provide various crafts to support metal and fabrication units during plant total shutdown at NGID WIPs.
Abqaiq complete
23 Saudi Aramco Project Title :

Replace exhaust fans of PIBs and substation at Abqaiq plant.
Abqaiq complete
24 SABIC - Saudi Kayan Project Title :

Repair services of 25.5MW LDPE motor including supply of motor with preventive maintenance of heat exchanger included hydro test, internal inspection of stator, installation of bolt joint, conditional assessment and gasket cleaning at SABIC - Saudi Kayan facilities.
Jubail complete
25 Saudi Aramco Project Title :

Fabrication, procurement and supply of flare tip at Haradh 2 & 3.
Udhailiyah complete
26 SABIC Project Title :

Design, manufacture, supply and installation for four (4 Nos.) motorized skimmers at YANSAB.
Yanbu complete
27 SABIC Project Title :

Construction of LP steam header unit 75 (OLEFINS) to LP steam header in U&O and control the LP steam from U&O at YANSAB.
Yanbu complete
28 Saudi Aramco Project Title :

Install new jet pump at ABGOSP-5 including supply of complete piping and electrical materials including excavation, foundation, fabrication of piping spools, supports, cable lying and control panel etc.
Udhailiyah complete
29 MARAFIQ Project Title :

Overhauling, shifting and replacement of 51 MV metering switchgear cubicles at Yanbu including preventive and corrective maintenance, spare parts, painting and replacing/repairing existing concrete foundation.
Yanbu complete
30 SWCC Project Title :

Design, engineering, supply, installation, testing and commissioning of sub-synchronous converter cascade systems including civil foundation, laying cables/terminals for five (5 Nos.) 9.3MW/11.5KW and seven (7 Nos.) 9.5MW/11.5KW slip ring induction motors of pumps.
Riyadh complete
31 MARAFIQ Project Title :

Engineering, design, procurement, installation, testing and commissioning of underground GRP pipelines for the process water redundancies (PWR) system at MARAFIQ (Yanbu) including geotechnical and geographical survey, civil excavation and back filling, testing and commissioning of entire pipe line including valves.
Yanbu complete
32 Saudi Aramco Project Title :

PR# 300488916 Three Year Mid Form contract for miscellaneous support on piping modification for various pipes and flanges including cold cutting, hydraulic torque bolting and unbolting, welding and flange plug testing at NGPD fields.
Abqaiq complete
33 Saudi Aramco Project Title :

Three Years Mid Form contract for replacement, fabrication, supply and installation of defective spools of gas wells and manifolds including internal coatings and NDT at site.
Various NDT Fields complete
34 SABIC - SHARQ Project Title :

Mechanical design, preparation of fabrication drawings, procurement of raw materials, fabrication, inspection, FAT, testing and supply of heat exchanger shell with tube bundle assembly to SHARQ warehouse.
Sharq complete
35 MARAFIQ Project Title :

Engineering and design, procurement, supply, installation, testing and commissioning of two (2 Nos.) 150KW and three (3 Nos.) 50KW, 480V, 3 Phase + Neutral, 60Hz diesel generator set at various pumping stations.
Yanbu complete
36 Saudi Aramco Project Title :

Three Year Mid Form contract for fabricate, supply and installation of water injection well head piping spools and reducers including coating (internal/external) and NDT to install chock valve at SWID facility.
Udhailiyah complete